Tuesday, November 3, 2015

Steel is up



In the last two days there's been some great progress, with the steel flush beam installed in the main floor, and two steel beams for the second floor in place. With the steel flush beam installed, the dip in the old floor is gone and we have the extra headroom in the basement. The steel on the second level is needed to support the stairwell area and the small indoor garden area beside it.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.

Financing a renovation